model one_oracle · arm moves_chat · instance scorable_negotiation-L4-d49e5fe070 · seed 1 · status done · {"cell": "five_seat_robustness__qwen_datacenter__one_oracle", "fill_policy": "bayes-rational", "robustness_schema": "five-seat-robustness-cell-v1", "robustness_condition": "qwen_datacenter", "source_bank_position_schedule": "treated=(source_bank_position+2*episode_seed) mod 5", "framing": "datacenter", "framing_map": {"framing": "datacenter", "title": "Northgate data-centre siting agreement", "issue_names": ["Location", "Power supply", "Build schedule", "Hiring"], "option_labels": [["Anvil Ridge", "Dunlow Yard", "Kestrel Park", "Weir Flats"], ["on-site turbines", "solar with storage", "grid tie-in", "shared substation"], ["five years", "three years", "phased over eight years", "eighteen months"], ["apprenticeship programme", "union hall referral", "local hiring pact", "open recruitment"]], "party_roles": ["Anvil Ridge Landholding (the owner of record of the candidate parcels)", "Northgate Water Board (the utility that supplies cooling water)", "Electrical Workers' Union (the construction and maintenance workforce)", "Office of the County Executive (the county-level executive)", "Riverside Residents' Assembly (the neighbourhood association beside the candidate sites)"]}}
Game setup
- Issues: Location (Anvil Ridge, Dunlow Yard, Kestrel Park, Weir Flats); Power supply (on-site turbines, solar with storage, grid tie-in, shared substation); Build schedule (five years, three years, phased over eight years, eighteen months); Hiring (apprenticeship programme, union hall referral, local hiring pact, open recruitment)
- Anvil Ridge Landholding (the owner of record of the candidate parcels) (τ=112): Location: Anvil Ridge=18, Dunlow Yard=37, Kestrel Park=55, Weir Flats=0; Power supply: on-site turbines=0, solar with storage=15, grid tie-in=30, shared substation=45; Build schedule: five years=0, three years=97, phased over eight years=65, eighteen months=32; Hiring: apprenticeship programme=0, union hall referral=0, local hiring pact=0, open recruitment=0
- Northgate Water Board (the utility that supplies cooling water) (τ=93): Location: Anvil Ridge=18, Dunlow Yard=36, Kestrel Park=53, Weir Flats=0; Power supply: on-site turbines=0, solar with storage=9, grid tie-in=18, shared substation=27; Build schedule: five years=0, three years=0, phased over eight years=0, eighteen months=0; Hiring: apprenticeship programme=0, union hall referral=85, local hiring pact=57, open recruitment=28
- Electrical Workers' Union (the construction and maintenance workforce) (τ=51): Location: Anvil Ridge=37, Dunlow Yard=19, Kestrel Park=0, Weir Flats=56; Power supply: on-site turbines=0, solar with storage=11, grid tie-in=22, shared substation=32; Build schedule: five years=0, three years=0, phased over eight years=0, eighteen months=0; Hiring: apprenticeship programme=0, union hall referral=0, local hiring pact=0, open recruitment=0
- Office of the County Executive (the county-level executive) (τ=79): Location: Anvil Ridge=16, Dunlow Yard=32, Kestrel Park=48, Weir Flats=0; Power supply: on-site turbines=0, solar with storage=9, grid tie-in=17, shared substation=26; Build schedule: five years=69, three years=46, phased over eight years=23, eighteen months=0; Hiring: apprenticeship programme=0, union hall referral=0, local hiring pact=0, open recruitment=0
- Riverside Residents' Assembly (the neighbourhood association beside the candidate sites) (τ=129): Location: Anvil Ridge=61, Dunlow Yard=30, Kestrel Park=0, Weir Flats=91; Power supply: on-site turbines=0, solar with storage=17, grid tie-in=34, shared substation=51; Build schedule: five years=0, three years=0, phased over eight years=0, eighteen months=0; Hiring: apprenticeship programme=65, union hall referral=97, local hiring pact=32, open recruitment=0
Turns
[0] Blake — turn (round 1)
PROPOSE {"Location": "Anvil Ridge", "Power supply": "shared substation", "Build schedule": "three years", "Hiring": "union hall referral"}
oracle regret: threshold=+0, acceptance=+0, bestresponse=+2.75
[1] Casey — turn (round 1)
ACCEPT P1
💬 P1 meets my threshold. I accept.
P1 scores 69 (above threshold 51). Accepting to advance deal.
oracle regret: threshold=+0, acceptance=+3.87, bestresponse=+0
[2] Devon — turn (round 1)
ACCEPT P1
💬 P1 meets my threshold. I accept.
P1 scores 88, above my threshold. Blake and Casey have accepted. Need Avery and Ember to accept too, but I can't force them. Since I'm already on board, I'll accept to solidify support.
oracle regret: threshold=+0, acceptance=+23.2, bestresponse=+0
[3] Ember — turn (round 1)
ACCEPT P1
💬 P1 meets my threshold. I accept to advance the deal.
P1 scores 209 (above threshold). Accepting moves us closer to closure. Need Avery's acceptance next.
oracle regret: threshold=+0, acceptance=+0, bestresponse=+0
[4] Avery — turn (round 1)
ACCEPT P1
💬 P1 meets my threshold. I accept.
P1 scores 160, which exceeds my threshold of 112. I should accept to finalize the deal.
oracle regret: threshold=+0, acceptance=+0, bestresponse=+15.6
Outcome
deal: {"Location": "Anvil Ridge", "Power supply": "shared substation", "Build schedule": "three years", "Hiring": "union hall referral"} (closed by consensus)
primary 1.0 · USW 192.0 · ESW 9.0 · NSW 23016960.0 · Gini 0.3583 · per-party surplus [48.0, 37.0, 18.0, 9.0, 80.0]