scorable_negotiation scorable_negotiation-moves_chat-e7181664cb
model one_oracle · arm moves_chat · instance scorable_negotiation-L0-a483b0d80d · seed 0 · status done · {"cell": "five_seat_robustness__qwen_datacenter__one_oracle", "fill_policy": "bayes-rational", "robustness_schema": "five-seat-robustness-cell-v1", "robustness_condition": "qwen_datacenter", "source_bank_position_schedule": "treated=(source_bank_position+2*episode_seed) mod 5", "framing": "datacenter", "framing_map": {"framing": "datacenter", "title": "Northgate data-centre siting agreement", "issue_names": ["Build schedule", "Site access", "Power supply", "Compensation"], "option_labels": [["five years", "phased over eight years", "eighteen months", "three years"], ["widened lane", "new spur road", "existing haul route", "rail siding"], ["on-site turbines", "shared substation", "solar with storage", "grid tie-in"], ["in-kind infrastructure", "rates abatement", "annual community fund", "one-off site payment"]], "party_roles": ["Regional Grid Authority (the body that authorises electricity connections)", "Electrical Workers' Union (the construction and maintenance workforce)", "Meridian Compute (the firm that would build and operate the facility)", "Northgate Borough Council (the elected local authority)", "Northgate Water Board (the utility that supplies cooling water)"]}}
Game setup
- Issues: Build schedule (five years, phased over eight years, eighteen months, three years); Site access (widened lane, new spur road, existing haul route, rail siding); Power supply (on-site turbines, shared substation, solar with storage, grid tie-in); Compensation (in-kind infrastructure, rates abatement, annual community fund, one-off site payment)
- Regional Grid Authority (the body that authorises electricity connections) (τ=63): Build schedule: five years=0, phased over eight years=11, eighteen months=32, three years=21; Site access: widened lane=21, new spur road=0, existing haul route=63, rail siding=42; Power supply: on-site turbines=0, shared substation=0, solar with storage=0, grid tie-in=0; Compensation: in-kind infrastructure=0, rates abatement=41, annual community fund=62, one-off site payment=21
- Electrical Workers' Union (the construction and maintenance workforce) (τ=40): Build schedule: five years=0, phased over eight years=17, eighteen months=51, three years=34; Site access: widened lane=0, new spur road=0, existing haul route=0, rail siding=0; Power supply: on-site turbines=0, shared substation=0, solar with storage=0, grid tie-in=0; Compensation: in-kind infrastructure=44, rates abatement=15, annual community fund=0, one-off site payment=29
- Meridian Compute (the firm that would build and operate the facility) (τ=71): Build schedule: five years=0, phased over eight years=9, eighteen months=26, three years=18; Site access: widened lane=0, new spur road=0, existing haul route=0, rail siding=0; Power supply: on-site turbines=0, shared substation=58, solar with storage=87, grid tie-in=29; Compensation: in-kind infrastructure=57, rates abatement=19, annual community fund=0, one-off site payment=38
- Northgate Borough Council (the elected local authority) (τ=65): Build schedule: five years=0, phased over eight years=18, eighteen months=54, three years=36; Site access: widened lane=0, new spur road=39, existing haul route=20, rail siding=59; Power supply: on-site turbines=0, shared substation=0, solar with storage=0, grid tie-in=0; Compensation: in-kind infrastructure=40, rates abatement=13, annual community fund=0, one-off site payment=27
- Northgate Water Board (the utility that supplies cooling water) (τ=63): Build schedule: five years=0, phased over eight years=8, eighteen months=25, three years=16; Site access: widened lane=0, new spur road=0, existing haul route=0, rail siding=0; Power supply: on-site turbines=17, shared substation=50, solar with storage=33, grid tie-in=0; Compensation: in-kind infrastructure=0, rates abatement=52, annual community fund=78, one-off site payment=26
Turns
[0] Avery — turn (round 1)
PROPOSE {"Build schedule": "eighteen months", "Site access": "rail siding", "Power supply": "shared substation", "Compensation": "in-kind infrastructure"}
oracle regret: threshold=+0, acceptance=+0, bestresponse=+0
[1] Blake — turn (round 1)
ACCEPT P1
💬 P1 meets my threshold. I accept.
P1 scores 95, above my threshold. Accepting now.
oracle regret: threshold=+0, acceptance=+0, bestresponse=+0
[2] Casey — turn (round 1)
ACCEPT P1
💬 P1 meets my threshold. I accept to advance the deal.
P1 scores 141, above my threshold. Accepting it moves us closer to closure. Blake already accepted, so I should accept to help finalize.
oracle regret: threshold=+0, acceptance=+0, bestresponse=+0
[3] Devon — turn (round 1)
ACCEPT P1
💬 P1 meets my threshold. I accept to push closure.
P1 scores 153 (surplus +88) — above my threshold. Accepting advances closure; Ember’s acceptance needed.
oracle regret: threshold=+0, acceptance=+0, bestresponse=+0
[4] Ember — turn (round 1)
ACCEPT P1
💬 P1 meets my threshold. I accept.
P1 scores 75 (above threshold). Accept to close deal.
oracle regret: threshold=+0, acceptance=+34.6, bestresponse=+0
Outcome
deal: {"Build schedule": "eighteen months", "Site access": "rail siding", "Power supply": "shared substation", "Compensation": "in-kind infrastructure"} (closed by consensus)
primary 0.9987 · USW 236.0 · ESW 11.0 · NSW 44721600.0 · Gini 0.3593 · per-party surplus [11.0, 55.0, 70.0, 88.0, 12.0]