{
 "run_name": "variantconfirm_conceding_novotes",
 "invocation": [
  "/juice2/u/siddharth/ii_mats/experiments/rational_agents/agent_variants/run_confirmation.py",
  "--variant",
  "conceding_novotes",
  "--no-wandb"
 ],
 "game": "scorable",
 "protocol_cfg": {},
 "turn_max_tokens": null,
 "table": "all_rational",
 "arms": [
  "moves_chat"
 ],
 "rational_seat": null,
 "fill_policy": null,
 "seeds": [
  0,
  1,
  2,
  3,
  4
 ],
 "scaffold": "canonical",
 "info": "private",
 "policies": [
  "bayes-rational"
 ],
 "framing": "datacenter",
 "framing_plans": {
  "scorable_negotiation-L0-033f0874d5": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Cooling",
    "Build schedule",
    "Power supply",
    "Site access"
   ],
   "option_labels": [
    [
     "reclaimed water",
     "river draw",
     "closed-loop plant",
     "air cooling"
    ],
    [
     "three years",
     "eighteen months",
     "five years",
     "phased over eight years"
    ],
    [
     "solar with storage",
     "shared substation",
     "grid tie-in",
     "on-site turbines"
    ],
    [
     "rail siding",
     "widened lane",
     "existing haul route",
     "new spur road"
    ]
   ],
   "party_roles": [
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)",
    "Electrical Workers' Union (the construction and maintenance workforce)",
    "Meridian Compute (the firm that would build and operate the facility)",
    "Northgate Water Board (the utility that supplies cooling water)",
    "Northgate Borough Council (the elected local authority)"
   ]
  },
  "scorable_negotiation-L0-44925c2d5b": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Location",
    "Power supply",
    "Build schedule",
    "Site access"
   ],
   "option_labels": [
    [
     "Anvil Ridge",
     "Dunlow Yard",
     "Weir Flats",
     "Kestrel Park"
    ],
    [
     "shared substation",
     "on-site turbines",
     "grid tie-in",
     "solar with storage"
    ],
    [
     "three years",
     "phased over eight years",
     "five years",
     "eighteen months"
    ],
    [
     "rail siding",
     "new spur road",
     "existing haul route",
     "widened lane"
    ]
   ],
   "party_roles": [
    "Meridian Compute (the firm that would build and operate the facility)",
    "Northgate Borough Council (the elected local authority)",
    "Office of the County Executive (the county-level executive)",
    "Riverside Residents' Assembly (the neighbourhood association beside the candidate sites)",
    "Northgate Water Board (the utility that supplies cooling water)"
   ]
  },
  "scorable_negotiation-L0-5b80bb74c6": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Hiring",
    "Build schedule",
    "Location",
    "Power supply"
   ],
   "option_labels": [
    [
     "apprenticeship programme",
     "local hiring pact",
     "union hall referral",
     "open recruitment"
    ],
    [
     "eighteen months",
     "phased over eight years",
     "five years",
     "three years"
    ],
    [
     "Dunlow Yard",
     "Anvil Ridge",
     "Weir Flats",
     "Kestrel Park"
    ],
    [
     "on-site turbines",
     "grid tie-in",
     "solar with storage",
     "shared substation"
    ]
   ],
   "party_roles": [
    "Regional Grid Authority (the body that authorises electricity connections)",
    "Electrical Workers' Union (the construction and maintenance workforce)",
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)",
    "Office of the County Executive (the county-level executive)",
    "Northgate Borough Council (the elected local authority)"
   ]
  },
  "scorable_negotiation-L0-86d39f433e": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Power supply",
    "Location",
    "Compensation",
    "Site access"
   ],
   "option_labels": [
    [
     "solar with storage",
     "grid tie-in",
     "shared substation",
     "on-site turbines"
    ],
    [
     "Anvil Ridge",
     "Weir Flats",
     "Kestrel Park",
     "Dunlow Yard"
    ],
    [
     "rates abatement",
     "in-kind infrastructure",
     "annual community fund",
     "one-off site payment"
    ],
    [
     "widened lane",
     "existing haul route",
     "new spur road",
     "rail siding"
    ]
   ],
   "party_roles": [
    "Office of the County Executive (the county-level executive)",
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)",
    "Regional Grid Authority (the body that authorises electricity connections)",
    "Meridian Compute (the firm that would build and operate the facility)",
    "Northgate Water Board (the utility that supplies cooling water)"
   ]
  },
  "scorable_negotiation-L0-db777d04d1": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Cooling",
    "Hiring",
    "Location",
    "Site access"
   ],
   "option_labels": [
    [
     "reclaimed water",
     "closed-loop plant",
     "air cooling",
     "river draw"
    ],
    [
     "apprenticeship programme",
     "union hall referral",
     "open recruitment",
     "local hiring pact"
    ],
    [
     "Anvil Ridge",
     "Weir Flats",
     "Kestrel Park",
     "Dunlow Yard"
    ],
    [
     "rail siding",
     "widened lane",
     "existing haul route",
     "new spur road"
    ]
   ],
   "party_roles": [
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)",
    "Regional Grid Authority (the body that authorises electricity connections)",
    "Office of the County Executive (the county-level executive)",
    "Riverside Residents' Assembly (the neighbourhood association beside the candidate sites)",
    "Northgate Borough Council (the elected local authority)"
   ]
  },
  "scorable_negotiation-L1-1381dc04db": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Site access",
    "Location",
    "Hiring",
    "Cooling"
   ],
   "option_labels": [
    [
     "new spur road",
     "rail siding",
     "widened lane",
     "existing haul route"
    ],
    [
     "Dunlow Yard",
     "Weir Flats",
     "Kestrel Park",
     "Anvil Ridge"
    ],
    [
     "apprenticeship programme",
     "local hiring pact",
     "open recruitment",
     "union hall referral"
    ],
    [
     "air cooling",
     "closed-loop plant",
     "river draw",
     "reclaimed water"
    ]
   ],
   "party_roles": [
    "Electrical Workers' Union (the construction and maintenance workforce)",
    "Northgate Borough Council (the elected local authority)",
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)",
    "Northgate Water Board (the utility that supplies cooling water)",
    "Riverside Residents' Assembly (the neighbourhood association beside the candidate sites)"
   ]
  },
  "scorable_negotiation-L1-6e5961e973": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Power supply",
    "Hiring",
    "Build schedule",
    "Location"
   ],
   "option_labels": [
    [
     "grid tie-in",
     "on-site turbines",
     "solar with storage",
     "shared substation"
    ],
    [
     "open recruitment",
     "apprenticeship programme",
     "union hall referral",
     "local hiring pact"
    ],
    [
     "phased over eight years",
     "five years",
     "eighteen months",
     "three years"
    ],
    [
     "Weir Flats",
     "Dunlow Yard",
     "Kestrel Park",
     "Anvil Ridge"
    ]
   ],
   "party_roles": [
    "Office of the County Executive (the county-level executive)",
    "Northgate Borough Council (the elected local authority)",
    "Northgate Water Board (the utility that supplies cooling water)",
    "Regional Grid Authority (the body that authorises electricity connections)",
    "Riverside Residents' Assembly (the neighbourhood association beside the candidate sites)"
   ]
  },
  "scorable_negotiation-L1-6f6151e1d5": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Site access",
    "Compensation",
    "Power supply",
    "Build schedule"
   ],
   "option_labels": [
    [
     "existing haul route",
     "widened lane",
     "rail siding",
     "new spur road"
    ],
    [
     "in-kind infrastructure",
     "one-off site payment",
     "annual community fund",
     "rates abatement"
    ],
    [
     "grid tie-in",
     "on-site turbines",
     "shared substation",
     "solar with storage"
    ],
    [
     "eighteen months",
     "three years",
     "five years",
     "phased over eight years"
    ]
   ],
   "party_roles": [
    "Meridian Compute (the firm that would build and operate the facility)",
    "Northgate Water Board (the utility that supplies cooling water)",
    "Electrical Workers' Union (the construction and maintenance workforce)",
    "Northgate Borough Council (the elected local authority)",
    "Riverside Residents' Assembly (the neighbourhood association beside the candidate sites)"
   ]
  },
  "scorable_negotiation-L1-a9e4838c4c": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Power supply",
    "Cooling",
    "Location",
    "Build schedule"
   ],
   "option_labels": [
    [
     "shared substation",
     "on-site turbines",
     "solar with storage",
     "grid tie-in"
    ],
    [
     "closed-loop plant",
     "reclaimed water",
     "river draw",
     "air cooling"
    ],
    [
     "Dunlow Yard",
     "Weir Flats",
     "Kestrel Park",
     "Anvil Ridge"
    ],
    [
     "eighteen months",
     "three years",
     "phased over eight years",
     "five years"
    ]
   ],
   "party_roles": [
    "Riverside Residents' Assembly (the neighbourhood association beside the candidate sites)",
    "Electrical Workers' Union (the construction and maintenance workforce)",
    "Regional Grid Authority (the body that authorises electricity connections)",
    "Northgate Water Board (the utility that supplies cooling water)",
    "Meridian Compute (the firm that would build and operate the facility)"
   ]
  },
  "scorable_negotiation-L1-b3fd37949a": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Site access",
    "Build schedule",
    "Hiring",
    "Location"
   ],
   "option_labels": [
    [
     "new spur road",
     "rail siding",
     "existing haul route",
     "widened lane"
    ],
    [
     "phased over eight years",
     "three years",
     "five years",
     "eighteen months"
    ],
    [
     "open recruitment",
     "apprenticeship programme",
     "union hall referral",
     "local hiring pact"
    ],
    [
     "Anvil Ridge",
     "Dunlow Yard",
     "Kestrel Park",
     "Weir Flats"
    ]
   ],
   "party_roles": [
    "Regional Grid Authority (the body that authorises electricity connections)",
    "Riverside Residents' Assembly (the neighbourhood association beside the candidate sites)",
    "Northgate Water Board (the utility that supplies cooling water)",
    "Electrical Workers' Union (the construction and maintenance workforce)",
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)"
   ]
  },
  "scorable_negotiation-L2-107032bc27": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Build schedule",
    "Power supply",
    "Cooling",
    "Location"
   ],
   "option_labels": [
    [
     "three years",
     "five years",
     "eighteen months",
     "phased over eight years"
    ],
    [
     "grid tie-in",
     "solar with storage",
     "shared substation",
     "on-site turbines"
    ],
    [
     "river draw",
     "closed-loop plant",
     "reclaimed water",
     "air cooling"
    ],
    [
     "Kestrel Park",
     "Dunlow Yard",
     "Weir Flats",
     "Anvil Ridge"
    ]
   ],
   "party_roles": [
    "Regional Grid Authority (the body that authorises electricity connections)",
    "Electrical Workers' Union (the construction and maintenance workforce)",
    "Northgate Borough Council (the elected local authority)",
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)",
    "Meridian Compute (the firm that would build and operate the facility)"
   ]
  },
  "scorable_negotiation-L2-5edb2fff08": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Compensation",
    "Site access",
    "Build schedule",
    "Power supply"
   ],
   "option_labels": [
    [
     "in-kind infrastructure",
     "annual community fund",
     "rates abatement",
     "one-off site payment"
    ],
    [
     "widened lane",
     "rail siding",
     "existing haul route",
     "new spur road"
    ],
    [
     "three years",
     "five years",
     "phased over eight years",
     "eighteen months"
    ],
    [
     "solar with storage",
     "grid tie-in",
     "shared substation",
     "on-site turbines"
    ]
   ],
   "party_roles": [
    "Office of the County Executive (the county-level executive)",
    "Meridian Compute (the firm that would build and operate the facility)",
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)",
    "Riverside Residents' Assembly (the neighbourhood association beside the candidate sites)",
    "Electrical Workers' Union (the construction and maintenance workforce)"
   ]
  },
  "scorable_negotiation-L2-c07670b4c3": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Site access",
    "Build schedule",
    "Cooling",
    "Power supply"
   ],
   "option_labels": [
    [
     "new spur road",
     "rail siding",
     "existing haul route",
     "widened lane"
    ],
    [
     "five years",
     "phased over eight years",
     "eighteen months",
     "three years"
    ],
    [
     "air cooling",
     "closed-loop plant",
     "reclaimed water",
     "river draw"
    ],
    [
     "on-site turbines",
     "shared substation",
     "solar with storage",
     "grid tie-in"
    ]
   ],
   "party_roles": [
    "Office of the County Executive (the county-level executive)",
    "Meridian Compute (the firm that would build and operate the facility)",
    "Electrical Workers' Union (the construction and maintenance workforce)",
    "Northgate Borough Council (the elected local authority)",
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)"
   ]
  },
  "scorable_negotiation-L2-cd5957683b": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Hiring",
    "Site access",
    "Power supply",
    "Location"
   ],
   "option_labels": [
    [
     "open recruitment",
     "local hiring pact",
     "apprenticeship programme",
     "union hall referral"
    ],
    [
     "widened lane",
     "rail siding",
     "existing haul route",
     "new spur road"
    ],
    [
     "grid tie-in",
     "shared substation",
     "solar with storage",
     "on-site turbines"
    ],
    [
     "Anvil Ridge",
     "Kestrel Park",
     "Weir Flats",
     "Dunlow Yard"
    ]
   ],
   "party_roles": [
    "Northgate Borough Council (the elected local authority)",
    "Northgate Water Board (the utility that supplies cooling water)",
    "Riverside Residents' Assembly (the neighbourhood association beside the candidate sites)",
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)",
    "Regional Grid Authority (the body that authorises electricity connections)"
   ]
  },
  "scorable_negotiation-L2-f3366df5c2": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Power supply",
    "Compensation",
    "Cooling",
    "Location"
   ],
   "option_labels": [
    [
     "shared substation",
     "on-site turbines",
     "solar with storage",
     "grid tie-in"
    ],
    [
     "annual community fund",
     "rates abatement",
     "in-kind infrastructure",
     "one-off site payment"
    ],
    [
     "reclaimed water",
     "air cooling",
     "river draw",
     "closed-loop plant"
    ],
    [
     "Weir Flats",
     "Dunlow Yard",
     "Kestrel Park",
     "Anvil Ridge"
    ]
   ],
   "party_roles": [
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)",
    "Northgate Borough Council (the elected local authority)",
    "Northgate Water Board (the utility that supplies cooling water)",
    "Electrical Workers' Union (the construction and maintenance workforce)",
    "Meridian Compute (the firm that would build and operate the facility)"
   ]
  },
  "scorable_negotiation-L3-09d8108a8f": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Cooling",
    "Site access",
    "Hiring",
    "Power supply"
   ],
   "option_labels": [
    [
     "air cooling",
     "closed-loop plant",
     "river draw",
     "reclaimed water"
    ],
    [
     "rail siding",
     "widened lane",
     "new spur road",
     "existing haul route"
    ],
    [
     "open recruitment",
     "apprenticeship programme",
     "union hall referral",
     "local hiring pact"
    ],
    [
     "solar with storage",
     "shared substation",
     "on-site turbines",
     "grid tie-in"
    ]
   ],
   "party_roles": [
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)",
    "Regional Grid Authority (the body that authorises electricity connections)",
    "Office of the County Executive (the county-level executive)",
    "Northgate Water Board (the utility that supplies cooling water)",
    "Electrical Workers' Union (the construction and maintenance workforce)"
   ]
  },
  "scorable_negotiation-L3-78a36182a2": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Cooling",
    "Power supply",
    "Hiring",
    "Build schedule"
   ],
   "option_labels": [
    [
     "river draw",
     "air cooling",
     "closed-loop plant",
     "reclaimed water"
    ],
    [
     "on-site turbines",
     "grid tie-in",
     "solar with storage",
     "shared substation"
    ],
    [
     "open recruitment",
     "local hiring pact",
     "union hall referral",
     "apprenticeship programme"
    ],
    [
     "three years",
     "phased over eight years",
     "five years",
     "eighteen months"
    ]
   ],
   "party_roles": [
    "Regional Grid Authority (the body that authorises electricity connections)",
    "Riverside Residents' Assembly (the neighbourhood association beside the candidate sites)",
    "Electrical Workers' Union (the construction and maintenance workforce)",
    "Office of the County Executive (the county-level executive)",
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)"
   ]
  },
  "scorable_negotiation-L3-81f699e3fe": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Compensation",
    "Build schedule",
    "Location",
    "Hiring"
   ],
   "option_labels": [
    [
     "rates abatement",
     "annual community fund",
     "in-kind infrastructure",
     "one-off site payment"
    ],
    [
     "five years",
     "phased over eight years",
     "three years",
     "eighteen months"
    ],
    [
     "Weir Flats",
     "Dunlow Yard",
     "Anvil Ridge",
     "Kestrel Park"
    ],
    [
     "local hiring pact",
     "open recruitment",
     "union hall referral",
     "apprenticeship programme"
    ]
   ],
   "party_roles": [
    "Office of the County Executive (the county-level executive)",
    "Electrical Workers' Union (the construction and maintenance workforce)",
    "Meridian Compute (the firm that would build and operate the facility)",
    "Northgate Water Board (the utility that supplies cooling water)",
    "Northgate Borough Council (the elected local authority)"
   ]
  },
  "scorable_negotiation-L3-8e55401ea3": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Hiring",
    "Compensation",
    "Build schedule",
    "Location"
   ],
   "option_labels": [
    [
     "open recruitment",
     "local hiring pact",
     "union hall referral",
     "apprenticeship programme"
    ],
    [
     "in-kind infrastructure",
     "one-off site payment",
     "rates abatement",
     "annual community fund"
    ],
    [
     "five years",
     "three years",
     "phased over eight years",
     "eighteen months"
    ],
    [
     "Dunlow Yard",
     "Weir Flats",
     "Kestrel Park",
     "Anvil Ridge"
    ]
   ],
   "party_roles": [
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)",
    "Regional Grid Authority (the body that authorises electricity connections)",
    "Northgate Water Board (the utility that supplies cooling water)",
    "Office of the County Executive (the county-level executive)",
    "Northgate Borough Council (the elected local authority)"
   ]
  },
  "scorable_negotiation-L3-901198dd46": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Cooling",
    "Power supply",
    "Hiring",
    "Build schedule"
   ],
   "option_labels": [
    [
     "river draw",
     "reclaimed water",
     "closed-loop plant",
     "air cooling"
    ],
    [
     "on-site turbines",
     "grid tie-in",
     "solar with storage",
     "shared substation"
    ],
    [
     "union hall referral",
     "open recruitment",
     "apprenticeship programme",
     "local hiring pact"
    ],
    [
     "eighteen months",
     "phased over eight years",
     "three years",
     "five years"
    ]
   ],
   "party_roles": [
    "Electrical Workers' Union (the construction and maintenance workforce)",
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)",
    "Riverside Residents' Assembly (the neighbourhood association beside the candidate sites)",
    "Meridian Compute (the firm that would build and operate the facility)",
    "Office of the County Executive (the county-level executive)"
   ]
  },
  "scorable_negotiation-L4-05f715c1e6": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Power supply",
    "Cooling",
    "Site access",
    "Location"
   ],
   "option_labels": [
    [
     "solar with storage",
     "grid tie-in",
     "on-site turbines",
     "shared substation"
    ],
    [
     "river draw",
     "air cooling",
     "closed-loop plant",
     "reclaimed water"
    ],
    [
     "widened lane",
     "rail siding",
     "new spur road",
     "existing haul route"
    ],
    [
     "Dunlow Yard",
     "Weir Flats",
     "Anvil Ridge",
     "Kestrel Park"
    ]
   ],
   "party_roles": [
    "Northgate Water Board (the utility that supplies cooling water)",
    "Regional Grid Authority (the body that authorises electricity connections)",
    "Riverside Residents' Assembly (the neighbourhood association beside the candidate sites)",
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)",
    "Office of the County Executive (the county-level executive)"
   ]
  },
  "scorable_negotiation-L4-35d9e3e112": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Hiring",
    "Power supply",
    "Site access",
    "Location"
   ],
   "option_labels": [
    [
     "open recruitment",
     "local hiring pact",
     "union hall referral",
     "apprenticeship programme"
    ],
    [
     "on-site turbines",
     "solar with storage",
     "grid tie-in",
     "shared substation"
    ],
    [
     "widened lane",
     "rail siding",
     "existing haul route",
     "new spur road"
    ],
    [
     "Dunlow Yard",
     "Kestrel Park",
     "Weir Flats",
     "Anvil Ridge"
    ]
   ],
   "party_roles": [
    "Riverside Residents' Assembly (the neighbourhood association beside the candidate sites)",
    "Meridian Compute (the firm that would build and operate the facility)",
    "Northgate Borough Council (the elected local authority)",
    "Regional Grid Authority (the body that authorises electricity connections)",
    "Electrical Workers' Union (the construction and maintenance workforce)"
   ]
  },
  "scorable_negotiation-L4-592a4f7b6d": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Site access",
    "Compensation",
    "Location",
    "Cooling"
   ],
   "option_labels": [
    [
     "existing haul route",
     "new spur road",
     "rail siding",
     "widened lane"
    ],
    [
     "rates abatement",
     "annual community fund",
     "in-kind infrastructure",
     "one-off site payment"
    ],
    [
     "Anvil Ridge",
     "Kestrel Park",
     "Weir Flats",
     "Dunlow Yard"
    ],
    [
     "river draw",
     "air cooling",
     "reclaimed water",
     "closed-loop plant"
    ]
   ],
   "party_roles": [
    "Electrical Workers' Union (the construction and maintenance workforce)",
    "Office of the County Executive (the county-level executive)",
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)",
    "Meridian Compute (the firm that would build and operate the facility)",
    "Northgate Water Board (the utility that supplies cooling water)"
   ]
  },
  "scorable_negotiation-L4-b9891ffb3e": {
   "framing": "datacenter",
   "title": "Northgate data-centre siting agreement",
   "issue_names": [
    "Site access",
    "Build schedule",
    "Hiring",
    "Location"
   ],
   "option_labels": [
    [
     "rail siding",
     "existing haul route",
     "new spur road",
     "widened lane"
    ],
    [
     "phased over eight years",
     "three years",
     "eighteen months",
     "five years"
    ],
    [
     "apprenticeship programme",
     "union hall referral",
     "local hiring pact",
     "open recruitment"
    ],
    [
     "Kestrel Park",
     "Dunlow Yard",
     "Anvil Ridge",
     "Weir Flats"
    ]
   ],
   "party_roles": [
    "Office of the County Executive (the county-level executive)",
    "Northgate Borough Council (the elected local authority)",
    "Anvil Ridge Landholding (the owner of record of the candidate parcels)",
    "Regional Grid Authority (the body that authorises electricity connections)",
    "Northgate Water Board (the utility that supplies cooling water)"
   ]
  }
 },
 "decision_support": [
  "none"
 ],
 "seeded_offer": null,
 "models": [
  "anthropic:claude-opus-5"
 ],
 "oracles": [
  "threshold",
  "acceptance",
  "belief",
  "bestresponse"
 ],
 "n_episodes": 120,
 "api_request_config": {},
 "n_planned": 120,
 "status_counts": {
  "done": 120
 },
 "instances_dir": "/nlp/scr/siddharth/ii_mats/rational_agents/variantconfirm_conceding_novotes/instances",
 "episodes_dir": "/nlp/scr/siddharth/ii_mats/rational_agents/variantconfirm_conceding_novotes/episodes",
 "instance_ids": [
  "scorable_negotiation-L0-033f0874d5",
  "scorable_negotiation-L0-44925c2d5b",
  "scorable_negotiation-L0-5b80bb74c6",
  "scorable_negotiation-L0-86d39f433e",
  "scorable_negotiation-L0-db777d04d1",
  "scorable_negotiation-L1-1381dc04db",
  "scorable_negotiation-L1-6e5961e973",
  "scorable_negotiation-L1-6f6151e1d5",
  "scorable_negotiation-L1-a9e4838c4c",
  "scorable_negotiation-L1-b3fd37949a",
  "scorable_negotiation-L2-107032bc27",
  "scorable_negotiation-L2-5edb2fff08",
  "scorable_negotiation-L2-c07670b4c3",
  "scorable_negotiation-L2-cd5957683b",
  "scorable_negotiation-L2-f3366df5c2",
  "scorable_negotiation-L3-09d8108a8f",
  "scorable_negotiation-L3-78a36182a2",
  "scorable_negotiation-L3-81f699e3fe",
  "scorable_negotiation-L3-8e55401ea3",
  "scorable_negotiation-L3-901198dd46",
  "scorable_negotiation-L4-05f715c1e6",
  "scorable_negotiation-L4-35d9e3e112",
  "scorable_negotiation-L4-592a4f7b6d",
  "scorable_negotiation-L4-b9891ffb3e"
 ],
 "provenance": {
  "parent_repo": {
   "sha": "c441aaf8495ee0b360b6b5f6a6501eefcb273ae7",
   "branch": "main",
   "dirty": true
  },
  "interlens_repo": {
   "sha": "68f6df63489e87de084953907fec827f669d49a7",
   "branch": "main",
   "dirty": true
  },
  "interlens_version": "0.1.60",
  "dependency_versions": {
   "transformers": "4.57.6",
   "torch": "2.12.1+cu130",
   "numpy": "2.4.2"
  }
 },
 "usage": null,
 "fabrication": null,
 "agent_variant": {
  "schema": "agent-variant-confirmation-v1",
  "variant": "conceding_novotes",
  "policy": "ConcedingNoVotes",
  "participant": "PolicyParticipant",
  "rounds": 4,
  "seeds": [
   0,
   1,
   2,
   3,
   4
  ],
  "bank": "/juice2/u/siddharth/ii_mats/experiments/rational_agents/instances_five_seat_private_v2",
  "revelation_caveat": "variants whose name starts with 'declaring' have seats publish their TRUE score sheet on the public channel; truthful revelation is a design choice for cooperative-by-construction agents, not an equilibrium claim",
  "summary": {
   "n_episodes": 120,
   "deal": 0.4083333333333333,
   "deal_lo": 0.2833333333333333,
   "deal_hi": 0.5416666666666666,
   "normalized": 0.3388575,
   "normalized_lo": 0.22943847916666665,
   "normalized_hi": 0.4534326249999999,
   "usw": 74.75833333333334,
   "usw_lo": 48.99854166666667,
   "usw_hi": 103.58604166666665,
   "min_seat": 3.55,
   "min_seat_lo": 2.2081250000000003,
   "min_seat_hi": 5.033333333333333,
   "ir_violation": 0.0,
   "ir_violation_lo": 0.0,
   "ir_violation_hi": 0.0,
   "closing_round": 5.0,
   "closing_round_lo": 5.0,
   "closing_round_hi": 5.0,
   "ir_all_proposals_r1": 0.1038961038961039,
   "ir_all_proposals_r3plus": 0.26677190213101815
  }
 }
}
